Sprinkler systems, Section 2
Monthly control valve, gauge and alarm checks with pump start where fitted. Six-monthly valve and water supply tests. Yearly alarm valve and flow switch operation, each water supply proved independently, pressures against baseline and the survey of pipework and heads. Five-yearly assessment items, with the long-interval sprinkler head sampling on the system's record for wet pipe systems.